2013-08-20
Traditionally the length of a production run was a key factor in the selection of a dimensional gaging system. Typically, the higher the production run, the more cost effective a dedicated or customized gaging system was likely to be, while shorter runs would require greater flexibility and versatility in gaging. A dedicated gage would be faster, more accurate, and least subject to operator influence, but would also likely be more expensive.